Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
接近搜索

Flamingo/Edgewater Widening

Project Description

Project will replace the existing two-lane Flamingo Boulevard from 776 to a point north of Edgewater Drive and the existing remaining section of two-lane Edgewater Drive from Midway Boulevard to Collingswood Boulevard with a new four-lane roadway. The project will also connect Flamingo Boulevard from its southernmost curve to the intersection of Edgewater Drive and Collingswood Boulevard, creating a new alignment for the roadways. Additionally, intersection improvements at 776 and Flamingo Boulevard will be included. 

The project is split into 3 phases, identified as phases 3, 4, & 5. The design will include all three phases and the construction will be multiphase. 

项目位置

Flamingo Boulevard from 776 to a point north of Edgewater Drive, connecting Flamingo Boulevard from its southernmost curve to the intersection of Edgewater Drive and Collingswood Boulevard, including Edgewater Drive from Midway Boulevard to Collingswood Boulevard. 

最新的更新

Johnson Engineering has been selected as the design firm for this project. The county is working with the firm to design all project phases. The design and permitting portion is expected to take about two and half years from the notice to proceed date of March 1, 2022.

  • 90% of field survey work has been completed.
  • Protected species and wetlands evalution in process.
  • 90% of geotechnical field work has been completed.
  • 60% roadway plans are under review. 
  • 60% bridge plans are under review.
  • 60% utility plans are under review.
  • The process has started to obtain the necessary SWFWMD permit.
  • Coordination to resolve outside utility conflicts is ongoing. 

预算

阶段 成本
设计 $5,068,415
Funding source(s):

2014 Sales Tax Extension for the design of phases 3, 4, & 5.

2020 Sales Tax Extension for the construction of phase 4, in the future.

时间表

阶段 Estimated Start Date Forecast Completion Actual Completion
设计 Development 03/01/2022 09/01/2024
建设 09/01/2024
Flamingo/Edgewater Widening Project Image

项目阶段
设计 Development

最后一次更新
10/23/2023

项目经理
林赛•约翰逊

公共关系
特蕾西·多尔蒂
Email 公共关系

项目数量
c412102

Sponsor Department
公共工程

设计 Engineer/Architect
Johnson Engineering

建设 Contractor
TBD

Sales Tax Project

Delivering Exceptional Service

问题? 问题?

澳门正规网赌网址大全